This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
vp75:initial-commissioning [2017/01/10 09:46] Simon Kühling [Initial commissioning] image paths fixed |
vp75:initial-commissioning [2017/01/10 09:48] Simon Kühling [Initial commissioning] link fix |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Initial commissioning ====== | ====== Initial commissioning ====== | ||
- | After [[:transport-and-installation|installing and connecting]] the VP75 is ready for initial commissioning. The first few steps will prepare your VP75 for its day-to-day duty: | + | After [[transport-and-installation|installing and connecting]] the VP75 is ready for initial commissioning. The first few steps will prepare your VP75 for its day-to-day duty: |
* Make sure that no foreign objects are left in the build chamber (transport locks, tools or the like). | * Make sure that no foreign objects are left in the build chamber (transport locks, tools or the like). | ||
* Close the build chamber. | * Close the build chamber. |