This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
vp75:transport-and-installation [2017/01/18 09:17] Simon Kühling wording |
vp75:transport-and-installation [2018/06/27 09:54] (current) Simon Kühling [Installation requirements] |
||
|---|---|---|---|
| Line 12: | Line 12: | ||
| ===== Delivery ===== | ===== Delivery ===== | ||
| The VP75 Additive Manufacturing System arrives at your place fully assembled and can be commissioned directly after setting it up and connecting the power supplies.\\ | The VP75 Additive Manufacturing System arrives at your place fully assembled and can be commissioned directly after setting it up and connecting the power supplies.\\ | ||
| + | |||
| + | Freight box dimensions: | ||
| + | * approx. 226 x 94 x 94 cm (LxWxH) | ||
| + | * shipping weight approx. 400kg | ||
| + | |||
| Included in the delivery are: | Included in the delivery are: | ||
| * the VP75 Additive Manufacturing System | * the VP75 Additive Manufacturing System | ||
| Line 52: | Line 57: | ||
| A 230 V power source must be within the range of the connection cable.\\ | A 230 V power source must be within the range of the connection cable.\\ | ||
| - | A compressed air supply (DN 7.2) must be within range. It must provide 6 bar of oil-free, dryed air. | + | A compressed air supply (DN 7.2) must be within range (note: no connecting hose included in delivery). It must provide 6 bar of oil-free, dryed air. Recommended air quality according to ISO 8573-1:2010 [1:4:2]. |
| - | Also, access to your LAN is required. Your network must provide DHCP IP address management. | + | Also, access to your LAN is required (note: no ethernet cable included in delivery). Your network must provide DHCP IP address management. |
| </WRAP> | </WRAP> | ||
| Line 140: | Line 145: | ||
| * completeness of the delivery | * completeness of the delivery | ||
| - | If you notice any deviants, please inform the hauler and the [[office@kuehlingkuehling.de|manufacturer]] **immediately**.\\ **Do not** put the VP75 to use with defective parts.\\ Failure to inform //Kuehling&Kuehling// in time will render any rectification claims void. The respective terms and deadlines are stated in the sales contract. | + | If you notice any deviants, please inform the hauler and the [[office@kuehlingkuehling.de|manufacturer]] **immediately**.\\ **Do not** put the VP75 to use with defective parts.\\ Failure to inform //Kühling&Kühling// in time will render any rectification claims void. The respective terms and deadlines are stated in the sales contract. |
| <WRAP info> | <WRAP info> | ||
| INFO | INFO | ||
| - | Kuehling&Kuehling //strongly recommend to store the transport box for later use. Find detailed information about repacking the machine for shipping in the [[:service-guide#packing-and-transport-safeguarding|Service Guide]].// | + | Kühling&Kühling //strongly recommend to store the transport box for later use. Find detailed information about repacking the machine for shipping in the [[:service-guide#packing-and-transport-safeguarding|Service Guide]].// |
| </WRAP> | </WRAP> | ||
| </WRAP> | </WRAP> | ||
| Line 196: | Line 201: | ||
| ===== Initial commissioning ===== | ===== Initial commissioning ===== | ||
| - | After set-up has been completed the further commissioning of the VP75 is done via the web-interface and the touchscreen as described in the [[:reprap-industrial-v1:Software version v1.1.0 - Operation and commissioning#Initial commissioning|Operating Manual]]. | + | After set-up has been completed the further commissioning of the VP75 is done via the web-interface and the touchscreen as described in [[Initial Commissioning]]. |
| ====== Decommissioning ====== | ====== Decommissioning ====== | ||
| Decommissioning may be necessary on two occasions: the temporary decommissioning if the machine is to be out of operation for a limited time (e.g. moving) or the permanent decommissioning if the machine has expired its lifetime and shall be disposed. | Decommissioning may be necessary on two occasions: the temporary decommissioning if the machine is to be out of operation for a limited time (e.g. moving) or the permanent decommissioning if the machine has expired its lifetime and shall be disposed. | ||