vp75:transport-and-installation

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
vp75:transport-and-installation [2017/01/18 11:04]
Simon Kühling typo
vp75:transport-and-installation [2018/06/27 09:54] (current)
Simon Kühling [Installation requirements]
Line 12: Line 12:
 ===== Delivery ===== ===== Delivery =====
 The VP75 Additive Manufacturing System arrives at your place fully assembled and can be commissioned directly after setting it up and connecting the power supplies.\\ The VP75 Additive Manufacturing System arrives at your place fully assembled and can be commissioned directly after setting it up and connecting the power supplies.\\
 +
 +Freight box dimensions:
 +  * approx. 226 x 94 x 94 cm (LxWxH)
 +  * shipping weight approx. 400kg
 +
 Included in the delivery are: Included in the delivery are:
   * the VP75 Additive Manufacturing System   * the VP75 Additive Manufacturing System
Line 52: Line 57:
 A 230 V power source must be within the range of the connection cable.\\ A 230 V power source must be within the range of the connection cable.\\
  
-A compressed air supply (DN 7.2) must be within range. It must provide 6 bar of oil-free, dryed air.+A compressed air supply (DN 7.2) must be within range (note: no connecting hose included in delivery). It must provide 6 bar of oil-free, dryed air. Recommended air quality according to ISO 8573-1:2010 [1:4:2].
  
-Also, access to your LAN is required. Your network must provide DHCP IP address management.+Also, access to your LAN is required ​(note: no ethernet cable included in delivery). Your network must provide DHCP IP address management.
 </​WRAP>​ </​WRAP>​
  
Line 196: Line 201:
  
 ===== Initial commissioning ===== ===== Initial commissioning =====
-After set-up has been completed the further commissioning of the VP75 is done via the web-interface and the touchscreen as described in the [[:​reprap-industrial-v1:​Software version v1.1.0 - Operation and commissioning#​Initial ​commissioning|Operating Manual]].+After set-up has been completed the further commissioning of the VP75 is done via the web-interface and the touchscreen as described in [[Initial ​Commissioning]].
 ====== Decommissioning ====== ====== Decommissioning ======
 Decommissioning may be necessary on two occasions: the temporary decommissioning if the machine is to be out of operation for a limited time (e.g. moving) or the permanent decommissioning if the machine has expired its lifetime and shall be disposed. Decommissioning may be necessary on two occasions: the temporary decommissioning if the machine is to be out of operation for a limited time (e.g. moving) or the permanent decommissioning if the machine has expired its lifetime and shall be disposed.