 ===== Delivery ===== ===== Delivery =====
 The VP75 Additive Manufacturing System arrives at your place fully assembled and can be commissioned directly after setting it up and connecting the power supplies.\\ The VP75 Additive Manufacturing System arrives at your place fully assembled and can be commissioned directly after setting it up and connecting the power supplies.\\
 +
 +Freight box dimensions:
 +  * approx. 226 x 94 x 94 cm (LxWxH)
 +  * shipping weight approx. 400kg
 +
 Included in the delivery are: Included in the delivery are:
   * the VP75 Additive Manufacturing System   * the VP75 Additive Manufacturing System
Line 52: Line 57:
 A 230 V power source must be within the range of the connection cable.\\ A 230 V power source must be within the range of the connection cable.\\
  
-A compressed air supply (DN 7.2) must be within range. It must provide 6 bar of oil-free, dryed air.+A compressed air supply (DN 7.2) must be within range (note: no connecting hose included in delivery). It must provide 6 bar of oil-free, dryed air. Recommended air quality according to ISO 8573-1:2010 [1:4:2].
  
-Also, access to your LAN is required. Your network must provide DHCP IP address management.+Also, access to your LAN is required ​(note: no ethernet cable included in delivery). Your network must provide DHCP IP address management.