This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
reprap-industrial-v1:software-version-v1.0.5-operation-and-commissioning [2014/10/31 11:30] Markus Bürgener [Setup] |
reprap-industrial-v1:software-version-v1.0.5-operation-and-commissioning [2014/11/03 15:03] Markus Bürgener [Initial commissioning] links updated |
||
---|---|---|---|
Line 21: | Line 21: | ||
|::: |::: | **//[[#Setup]]//** provides wizards for different preset operating procedures | | |::: |::: | **//[[#Setup]]//** provides wizards for different preset operating procedures | | ||
| 3 | Print job list | list of uploaded print jobs sorted by time/date (oldest first) | | | 3 | Print job list | list of uploaded print jobs sorted by time/date (oldest first) | | ||
- | | 4 | [Emergency STOP] button | see [[#Personnel safety and device reliability|safety information]] | | + | | 4 | [Emergency STOP] button | see [[manual#Emergency stop|safety information]] | |
| 5 | [print] button | Push to start the respective print job. | | | 5 | [print] button | Push to start the respective print job. | | ||
| 6 | Browse buttons | Use [Previous], [Next] and [//page number//] to browse the print job list. | | | 6 | Browse buttons | Use [Previous], [Next] and [//page number//] to browse the print job list. | | ||
Line 227: | Line 227: | ||
If you want to continue printing with the same type of plastic, the change of the filament spool is quite easy. | If you want to continue printing with the same type of plastic, the change of the filament spool is quite easy. | ||
You have to manually remove remaining filament from the supply hose, change and, if need be, [[#Adjusting the spool carriers|adjust the spool carriers]] and insert the new strand. | You have to manually remove remaining filament from the supply hose, change and, if need be, [[#Adjusting the spool carriers|adjust the spool carriers]] and insert the new strand. | ||
- | - Go to the **//Setup//** menu and start the **[Unload Filament]** wizard and follow the on-screen instructions. | + | * Go to the //Setup// menu and start the [Unload Filament] wizard and follow the on-screen instructions. |
- | - Then open **//Setup//** menu again, and follow the **[Load Filament]** wizard. | + | * Open the //Setup// menu again, and follow the [Load Filament] wizard. |
<WRAP clear></WRAP> | <WRAP clear></WRAP> | ||
Line 251: | Line 251: | ||
<WRAP group> | <WRAP group> | ||
<WRAP half column> | <WRAP half column> | ||
- | - Unload the current filament as described [[#Refilling with the same material type|above]]. | + | * Unload the current filament as described above. |
- | - Subsequent to unloading you have to change the extruder nozzle barrel as described [[#Removing / reinstalling the extruder nozzle barrels|here]]. | + | * Subsequent to unloading you have to change the extruder nozzle barrel as described [[service-guide#Removing / reinstalling the extruder nozzle tips and/or the barrels|here]]. |
- | - Afterwards, install (and [[#Adjusting the spool carriers|adjust]]) the new filament spool, run the [Load Filament] wizard **and** the [Priming] wizard. | + | * Afterwards, install (and [[#Adjusting the spool carriers|adjust]]) the new filament spool, run the [Load Filament] wizard **and** the [Priming] wizard. |
</WRAP> | </WRAP> | ||
Line 292: | Line 292: | ||
<WRAP group> | <WRAP group> | ||
<WRAP half column> | <WRAP half column> | ||
- | - Use the Allen key to **loosen** the fixing screws of the carrier. | + | * Use the Allen key to **loosen** the fixing screws of the carrier. |
- | - Slide the carrier to or away from the filament inlet to a position that leaves approximately 1 cm between the spool's outer rim and the limit switch. Make sure that the filament enters the inlet at an angle of 85-90°. | + | </WRAP> |
- | - Refasten the fixing screws. | + | |
+ | <WRAP half column> | ||
+ | [{{:reprap-industrial-v1:mtc_filamentmovespools.png?400|Loosen the fixing screws of the spool carriers.}}] | ||
+ | </WRAP> | ||
+ | </WRAP> | ||
+ | |||
+ | <WRAP group> | ||
+ | <WRAP half column> | ||
+ | * Slide the carrier to or away from the filament inlet to a position that leaves approximately 1 cm between the spool's outer rim and the limit switch. Make sure that the filament enters the inlet at an angle of 85-90°. | ||
+ | * Refasten the fixing screws. | ||
</WRAP> | </WRAP> | ||
<WRAP half column> | <WRAP half column> | ||
- | [{{:reprap-industrial-v1:mtc_filamentmovespools.png?400|fixing screws of spool carriers}}] | + | [{{:reprap-industrial-v1:mtc_filamentinletmeasures.png?400|Admissible distance and inlet angle.}}] |
- | [{{:reprap-industrial-v1:mtc_filamentinletmeasures.png?400|measures}}] | + | |
</WRAP> | </WRAP> | ||
</WRAP> | </WRAP> | ||
Line 307: | Line 314: | ||
===== Initial commissioning ===== | ===== Initial commissioning ===== | ||
- | After [[:reprap-industrial-v1:manual|installation]] the RepRap Industrial is ready for initial commissioning. The first few steps will prepare your RepRap Industrial for its day-to-day duty: | + | After [[manual#Setup and Installation|installation]] the RepRap Industrial is ready for initial commissioning. The first few steps will prepare your RepRap Industrial for its day-to-day duty: |
* Make sure that no foreign objects are left in the build chamber (transport locks, tools or the like). | * Make sure that no foreign objects are left in the build chamber (transport locks, tools or the like). | ||
* Close the build chamber. | * Close the build chamber. | ||
Line 313: | Line 320: | ||
The next step is preheating the build chamber and the print bed in order to enable calibration at operating temperature: | The next step is preheating the build chamber and the print bed in order to enable calibration at operating temperature: | ||
* Tap [[#Manual Control|[Manual Control]]] to enter the respective menu. | * Tap [[#Manual Control|[Manual Control]]] to enter the respective menu. | ||
- | * Activate the build chamber by tapping [[#Queue|[Build Chamber ON]] and then start the heating by tapping [[#Manual Control|[Preheat Chamber/Bed ON]]]. The current temperatures are indicated on the right side of the screen. You can always check the temperature by tapping [[#Manual Control|[Refresh temperatures]]]. | + | * Activate the build chamber by tapping [[#Manual Control|[Build Chamber ON]]] and then start the heating by tapping [[#Manual Control|[Preheat Chamber/Bed ON]]]. The current temperatures are indicated on the right side of the screen. You can always check the temperature by tapping [[#Manual Control|[Refresh temperatures]]]. |
* Let the build chamber heat for approximately 45 minutes. | * Let the build chamber heat for approximately 45 minutes. | ||