User Tools

Site Tools


reprap-industrial-v1:software-version-v1.0.5-operation-and-commissioning

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
reprap-industrial-v1:software-version-v1.0.5-operation-and-commissioning [2014/11/03 14:39]
Markus Bürgener [Queue] orthography
reprap-industrial-v1:software-version-v1.0.5-operation-and-commissioning [2014/11/03 15:05]
Markus Bürgener [Initial commissioning]
Line 314: Line 314:
  
 ===== Initial commissioning ===== ===== Initial commissioning =====
-After [[:​reprap-industrial-v1:​manual|installation]] the RepRap Industrial is ready for initial commissioning. The first few steps will prepare your RepRap Industrial for its day-to-day duty:+After [[manual#Setup and Installation|installation]] the RepRap Industrial is ready for initial commissioning. The first few steps will prepare your RepRap Industrial for its day-to-day duty:
   * Make sure that no foreign objects are left in the build chamber (transport locks, tools or the like).   * Make sure that no foreign objects are left in the build chamber (transport locks, tools or the like).
   * Close the build chamber.   * Close the build chamber.
Line 320: Line 320:
 The next step is preheating the build chamber and the print bed in order to enable calibration at operating temperature:​ The next step is preheating the build chamber and the print bed in order to enable calibration at operating temperature:​
   * Tap [[#Manual Control|[Manual Control]]] to enter the respective menu.   * Tap [[#Manual Control|[Manual Control]]] to enter the respective menu.
-  * Activate the build chamber by tapping [[#Queue|[Build Chamber ON]] and then start the heating by tapping [[#Manual Control|[Preheat Chamber/Bed ON]]]. The current temperatures are indicated on the right side of the screen. ​ You can always check the temperature by tapping [[#Manual Control|[Refresh temperatures]]].+  * Activate the build chamber by tapping [[#Manual Control|[Build Chamber ON]]] and then start the heating by tapping [[#Manual Control|[Preheat Chamber/Bed ON]]]. The current temperatures are indicated on the right side of the screen. ​ You can always check the temperature by tapping [[#Manual Control|[Refresh temperatures]]].
   * Let the build chamber heat for approximately 45 minutes.   * Let the build chamber heat for approximately 45 minutes.
  
Line 351: Line 351:
 To check or alter the settings, proceed as follows: To check or alter the settings, proceed as follows:
  
-The material profile for each extruder is chosen via the [Select Filament Profile] button in the **//Setup//** menu. +The material profile for each extruder is chosen via the [Select Filament Profile] button in the //Setup// menu. 
 </​WRAP>​ </​WRAP>​
  
Line 458: Line 458:
 <WRAP group> <WRAP group>
 <WRAP half column> <WRAP half column>
-Make sure that all steps described ​in //[[#First start-up]]// ​have been carried out.+Make sure that all previously ​described ​steps have been carried out.
  
 The next steps are carried out at the 3D printer'​s GUI:\\ The next steps are carried out at the 3D printer'​s GUI:\\
reprap-industrial-v1/software-version-v1.0.5-operation-and-commissioning.txt · Last modified: 2015/03/13 10:06 by Markus Bürgener