This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
reprap-industrial-v1:software-version-v1.0.5-operation-and-commissioning [2014/11/03 14:44] Markus Bürgener [Initial commissioning] links updated |
reprap-industrial-v1:software-version-v1.0.5-operation-and-commissioning [2014/11/03 15:04] Markus Bürgener [The first print] links updated/deleted |
||
---|---|---|---|
Line 314: | Line 314: | ||
===== Initial commissioning ===== | ===== Initial commissioning ===== | ||
- | After [[:reprap-industrial-v1:manual|installation]] the RepRap Industrial is ready for initial commissioning. The first few steps will prepare your RepRap Industrial for its day-to-day duty: | + | After [[manual#Setup and Installation|installation]] the RepRap Industrial is ready for initial commissioning. The first few steps will prepare your RepRap Industrial for its day-to-day duty: |
* Make sure that no foreign objects are left in the build chamber (transport locks, tools or the like). | * Make sure that no foreign objects are left in the build chamber (transport locks, tools or the like). | ||
* Close the build chamber. | * Close the build chamber. | ||
Line 458: | Line 458: | ||
<WRAP group> | <WRAP group> | ||
<WRAP half column> | <WRAP half column> | ||
- | Make sure that all steps described in //[[#First start-up]]// have been carried out. | + | Make sure that all previously described steps have been carried out. |
The next steps are carried out at the 3D printer's GUI:\\ | The next steps are carried out at the 3D printer's GUI:\\ |