ht500:service-guide [2016/05/20 12:14]
Markus Bürgener [Changing the nozzle tip] adapted to ht500
ht500:service-guide [2016/05/20 12:23]
Markus Bürgener [Changing the hot-end barrels] false pictures removed, adapted to ht500
Line 590: Line 590:
 === Additional information === === Additional information ===
 {{anchor:​sgc03}} {{anchor:​sgc03}}
-  * [[reprap-industrial-v1:​service-guide#​cleaning-recommendation|Cleaning recommendation]] +  * [[ht500:​service-guide#​cleaning-recommendation|Cleaning recommendation]] 
-  * [[reprap-industrial-v1:​knowledge-base#​materials|Knowledgebase]]+  * [[ht500:​knowledge-base#​materials|Knowledgebase]]
   * Software manual: [[reprap-industrial-v1:​software-version-v1.1.0-operation-and-commissioning#​omc131|filament change]]   * Software manual: [[reprap-industrial-v1:​software-version-v1.1.0-operation-and-commissioning#​omc131|filament change]]
-  * Troubleshooting:​ [[reprap-industrial-v1:​troubleshooting#​p1c9|P1]]+  * Troubleshooting:​ [[ht500:​troubleshooting#​p1c9|P1]]
  
 === Deinstalling the barrel === === Deinstalling the barrel ===
Line 599: Line 599:
 <WRAP half column> <WRAP half column>
   * [[#​removing-the-nozzle-tip|Remove the nozzle tip]] as described above.   * [[#​removing-the-nozzle-tip|Remove the nozzle tip]] as described above.
-  * With both set screws ​loosened, carefully push the barrel to the limit up the nozzle seat. +  * With the set screw loosened, carefully push the barrel to the limit up the nozzle seat. 
-  * Fixate the barrel by fastening ​one of the set screws.+  * Fixate the barrel by fastening the set screw.
 </​WRAP>​ </​WRAP>​
  
 <WRAP half column> <WRAP half column>
-[{{:reprap-industrial-v1:mtc_pushbarrelup.png?​400|Push the barrel up to the limit and refasten ​one set screw}}] +[{{:ht500:coming_soon.png?​400|Push the barrel up to the limit and refasten the set screw}}]
-</​WRAP>​ +
-</​WRAP>​ +
- +
-<WRAP group> +
-<WRAP half column>​ +
-  * Loosen ​the set screw of the heating block with a #1.5 Allen wrench. +
-</​WRAP>​ +
-<WRAP half column>​ +
-[{{:​reprap-industrial-v1:​mtc_loosensetscrewheater.png?​400|Loosening heating block set screw.}}]+
 </​WRAP>​ </​WRAP>​
 </​WRAP>​ </​WRAP>​
Line 623: Line 614:
  
 <WRAP half column> <WRAP half column>
-[{{:reprap-industrial-v1:mtc_pullheateroff.png?​400|Pulling the heating block off the barrel.}}]+[{{:ht500:coming_soon.png?​400|Pulling the heating block off the barrel.}}]
 </​WRAP>​ </​WRAP>​
 </​WRAP>​ </​WRAP>​
  
-<WRAP note> 
-<WRAP group> 
-<WRAP half column> 
-NOTICE 
- 
-**Do not** try to pull the heater off without pushing the barrel up.\\ The heating resistor'​s cable may be damaged otherwise. 
-</​WRAP>​ 
- 
-<WRAP half column> 
-{{ :​reprap-industrial-v1:​mtc_heatercablewarning.png?​200 |}} 
-</​WRAP>​ 
-</​WRAP>​ 
-</​WRAP>​ 
  
 <WRAP group> <WRAP group>
Line 647: Line 625:
  
 <WRAP half column> <WRAP half column>
-[{{:reprap-industrial-v1:mtc_pullbarrelout.png?​400|Pull the barrel out of its seat.}}]+[{{:ht500:coming_soon.png?​400|Pull the barrel out of its seat.}}]
 </​WRAP>​ </​WRAP>​
 </​WRAP>​ </​WRAP>​
Line 657: Line 635:
 <WRAP half column> <WRAP half column>
 Install the **left** extruder nozzle first: Install the **left** extruder nozzle first:
-  * Carefully push the barrel to the limit up the nozzle seat and fixate it by fastening ​one set screw. +  * Carefully push the barrel to the limit up the hot-end mount and fixate it by fastening ​the set screw. 
-  * Slip the heating block onto the melter up to the hex section and fasten the set screw tightly. +  * Slip the heating block onto the barrel.
-</​WRAP>​ +
-<WRAP half column>​ +
-{{anchor:​sgc333}} +
-<WRAP info> +
-INFO +
- +
-//A sheer metal surface of the heating block'​s bore and soundly fastening the set screw are vitally important for the heat transfer from heating block to melter.\\ Prior to installation check the inner surface of the bore. If required, refasten the set screw after shortly heating the hot-end to extrusion temperature to soften plastic seeped into the thread.// +
-</​WRAP>​ +
-</​WRAP>​ +
-</​WRAP>​ +
- +
-<WRAP group> +
-<WRAP half column>+
   * Loosen the set screw and lower the barrel until its upper end is level with the hot-end mount'​s upper rim.   * Loosen the set screw and lower the barrel until its upper end is level with the hot-end mount'​s upper rim.
-  * Fasten the two set screws with a #1.5 Allen wrench.+  * Fasten the set screw.
   * Install the **right** extruder nozzle in the given order but a little above the left hot-end.   * Install the **right** extruder nozzle in the given order but a little above the left hot-end.
   * Run the [[reprap-industrial-v1:​software-version-v1.1.0-operation-and-commissioning#​omc13t11|Print Bed Leveling]] wizard.   * Run the [[reprap-industrial-v1:​software-version-v1.1.0-operation-and-commissioning#​omc13t11|Print Bed Leveling]] wizard.
Line 685: Line 650:
 //The barrel'​s upper rim and the recess are suitable indicators for the correct height (compare pictures below).// //The barrel'​s upper rim and the recess are suitable indicators for the correct height (compare pictures below).//
 </​WRAP>​ </​WRAP>​
-[{{:reprap-industrial-v1:mtc_aligningbarrel.png?300|Aligning the extruder barrel and the hot end mount'​s upper rim.}}] +[{{:ht500:coming_soon.png?400|Aligning the extruder barrel and the hot end mount'​s upper rim.}}] 
-[{{:reprap-industrial-v1:mtc_aligningbarrelhigh.png?300|Barrel pushed up too far into its seat (exaggerated).}}] +[{{:ht500:coming_soon.png?400|Barrel pushed up too far into its seat (exaggerated).}}] 
-[{{:reprap-industrial-v1:mtc_aligningbarrellow.png?300|Barrel too low in its seat (exaggerated).}}]+[{{:ht500:coming_soon.png?400|Barrel too low in its seat (exaggerated).}}]
 </​WRAP>​ </​WRAP>​
 </​WRAP>​ </​WRAP>​
ht500/service-guide.txt · Last modified: 2017/01/18 09:51 by Simon Kühling