 ===== Initial commissioning ===== ===== Initial commissioning =====
-After set-up has been completed the further commissioning of the VP75 is done via the web-interface and the touchscreen as described in the [[:​reprap-industrial-v1:​Software version v1.1.0 - Operation and commissioning#​Initial ​commissioning|Operating Manual]].+After set-up has been completed the further commissioning of the VP75 is done via the web-interface and the touchscreen as described in [[Initial ​Commissioning]].
 ====== Decommissioning ====== ====== Decommissioning ======
 Decommissioning may be necessary on two occasions: the temporary decommissioning if the machine is to be out of operation for a limited time (e.g. moving) or the permanent decommissioning if the machine has expired its lifetime and shall be disposed. Decommissioning may be necessary on two occasions: the temporary decommissioning if the machine is to be out of operation for a limited time (e.g. moving) or the permanent decommissioning if the machine has expired its lifetime and shall be disposed.