This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
vp75:transport-and-installation [2017/01/18 11:04] Simon Kühling typo |
vp75:transport-and-installation [2017/01/18 11:57] Simon Kühling [Initial commissioning] link fix |
||
---|---|---|---|
Line 196: | Line 196: | ||
===== Initial commissioning ===== | ===== Initial commissioning ===== | ||
- | After set-up has been completed the further commissioning of the VP75 is done via the web-interface and the touchscreen as described in the [[:reprap-industrial-v1:Software version v1.1.0 - Operation and commissioning#Initial commissioning|Operating Manual]]. | + | After set-up has been completed the further commissioning of the VP75 is done via the web-interface and the touchscreen as described in [[Initial Commissioning]]. |
====== Decommissioning ====== | ====== Decommissioning ====== | ||
Decommissioning may be necessary on two occasions: the temporary decommissioning if the machine is to be out of operation for a limited time (e.g. moving) or the permanent decommissioning if the machine has expired its lifetime and shall be disposed. | Decommissioning may be necessary on two occasions: the temporary decommissioning if the machine is to be out of operation for a limited time (e.g. moving) or the permanent decommissioning if the machine has expired its lifetime and shall be disposed. |