This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
vp75:transport-and-installation [2018/06/27 09:50] Simon Kühling [Delivery] add freigh box dimensions |
vp75:transport-and-installation [2018/06/27 09:54] Simon Kühling [Installation requirements] |
||
---|---|---|---|
Line 57: | Line 57: | ||
A 230 V power source must be within the range of the connection cable.\\ | A 230 V power source must be within the range of the connection cable.\\ | ||
- | A compressed air supply (DN 7.2) must be within range. It must provide 6 bar of oil-free, dryed air. | + | A compressed air supply (DN 7.2) must be within range (note: no connecting hose included in delivery). It must provide 6 bar of oil-free, dryed air. Recommended air quality according to ISO 8573-1:2010 [1:4:2]. |
- | Also, access to your LAN is required. Your network must provide DHCP IP address management. | + | Also, access to your LAN is required (note: no ethernet cable included in delivery). Your network must provide DHCP IP address management. |
</WRAP> | </WRAP> | ||