User Tools

Site Tools


vp75:transport-and-installation

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Last revision Both sides next revision
vp75:transport-and-installation [2018/06/27 09:50]
Simon Kühling [Delivery] add freigh box dimensions
vp75:transport-and-installation [2018/06/27 09:51]
Simon Kühling [Installation requirements] add air quality specification
Line 57: Line 57:
 A 230 V power source must be within the range of the connection cable.\\ A 230 V power source must be within the range of the connection cable.\\
  
-A compressed air supply (DN 7.2) must be within range. It must provide 6 bar of oil-free, dryed air.+A compressed air supply (DN 7.2) must be within range. It must provide 6 bar of oil-free, dryed air. Recommended air quality according to ISO 8573-1:2010 [1:4:2].
  
 Also, access to your LAN is required. Your network must provide DHCP IP address management. Also, access to your LAN is required. Your network must provide DHCP IP address management.
vp75/transport-and-installation.txt · Last modified: 2018/06/27 09:54 by Simon Kühling